How we work and how we bid

The paperwork reaches you before the building does

A written report, a drawn concept when there is something to draw, one number, a signed change order for anything new and a closeout package at the end. Every document carries a control number that never changes. These are real pages from real jobs, with client details blurred.

The standard we hold

The standard we hold

  • The document reaches the client before the building does.
    How we run every job
  • We photograph what we find. We name what we could not see. We put the recommendation in writing before anyone talks about money.
    From our roof inspection reports
  • Say what is not included as clearly as what is.
    How we write a proposal
  • Verbal approval is not approval.
    How we handle changes

First call to warranty

Ten steps, each one in writing

Scroll the steps. The panel shows the document you hold at each one, real pages where we have them and the outline where the page is yours alone.

  1. 01EV-WEB

    First contact

    Call (979) 406-5431 or send the form, Monday to Friday 9 to 5, in English or Spanish. Every request gets its own number the moment it arrives.

    You receive. A request number and a call back during business hours with a time to come out.

    EV-WEBRequest
    Request
    EV-WEB-YYMMDD
    Need
    What you picked
    Town
    Where the job is
    Photos
    Up to five
    Language
    English · Español
    Next
    Call back, set a visit
  2. 02Site visit

    We walk it

    We walk the property, get on the roof where it is safe and photograph everything. For a new structure we measure the site and mark where it will sit.

    You receive. Nothing to sign. Just the visit, and answers to your questions on the spot.

    A real EV photographic evidence page with close ups of roof shingles, the street address blurred
  3. 03INS

    Inspection report

    Roofs and condition questions get a standalone written report: what we found, what the evidence shows, a recommended course in order of priority, and what we could not see.

    You receive. The Roof Inspection Report. Photographs page by page. No price in it, and no claim language.

    Cover of a real EV roof inspection report, with the address blurredExecutive summary page of a real EV roof inspection report, with the address blurred
  4. 04CPT

    Concept, when there is something to draw

    New structures, additions and big remodels get drawn first: a plan at true scale, where it lands on your property, how it will look, and every decision you need to make, each with our recommendation.

    You receive. The Concept, a 17 by 11 drawing set. It carries no pricing and is not an offer. Two revision rounds are included.

    A real EV master plan sheet in the drawing set style, with the owner details blurredA real EV concept page with the plan of an outbuilding, owner details blurred
  5. 05BID

    One number

    One price for the whole job. One scope page per zone or stage, what it does not touch, and what you own at the end. Included and not included, side by side.

    You receive. The Proposal, five to seven pages, with the warranty row for your trade written in. The total appears three times and nowhere else.

    Cover of a real EV proposal for a driveway replacement, with the client and the price blurredInvestment page of a real EV proposal with included and not included lists, prices blurred
  6. 06EXECUTED

    Signed

    You sign, every owner of record signs, and the signed proposal becomes the contract copy. The number on it never changes.

    You receive. The executed proposal, stamped EXECUTED, and a deposit invoice if your proposal calls for one.

    EXECUTEDExecuted proposal
    Document
    EV-YY-NNN-BID-Rnn
    Status
    EXECUTED
    Signed by
    Every owner of record
    Scope
    As written, zone by zone
    Warranty
    Row for your trade
    Changes
    Only by change order
  7. 07CO01

    The build and change orders

    Photos before anything is covered. Anything new, anything hidden that turns up, anything that moves the cost or the schedule becomes a written change order. Work on that item waits for your signature. Everything else keeps going.

    You receive. A change order for each change: why, with the photograph, what is added or removed, its price, the schedule impact in working days even when it is zero, and the running contract total.

    CO01Change order
    Parent
    EV-YY-NNN-BID-Rnn
    Change
    CO01 · date
    Why
    With the photograph
    Added or removed
    In plain words
    Schedule
    Working days, even zero
    Running total
    Original, changes, revised
    Signatures
    Before the work
  8. 08INV

    Invoices

    Billed against the signed proposal only. No new figures, no surprises, and photographs of the work alongside.

    You receive. An invoice that references the signed proposal, the amount to date and the balance.

    INVInvoice
    Against
    EV-YY-NNN-BID-Rnn
    Draw
    As the proposal states
    To date
    What is done
    Balance
    What is left
    Photos
    Of the work
    New figures
    None
  9. 09CLO

    Walkthrough and closeout

    A walkthrough with you, standing in front of the finished work. The punch list is written during the walkthrough and issued the same day.

    You receive. The closeout package within five working days of the last punch item clearing: what was built, before and after photographs, the punch list cleared, the warranty as written, and who to call.

    CLOCloseout package
    Built
    Including every change order
    Photos
    Before and after
    Punch list
    Each item dated
    Warranty
    Word for word from the bid
    Care
    How to look after it
    Who to call
    For good
  10. 10WTY

    Warranty

    Cover begins at substantial completion. Roofing work carries a 10 year workmanship warranty, and your proposal states the row for your trade, word for word. Materials carry the manufacturer warranty. The full schedule is on the warranty page.

    You receive. The warranty exactly as your proposal wrote it. Questions, call the office.

    WTYWarranty
    Roofing
    10 years workmanship
    Your trade
    The row in your proposal
    Materials
    Manufacturer warranty
    Starts
    Substantial completion
    Source
    Your signed proposal
    Schedule
    evroofingbcs.com/warranty

Document control

One number, one document, forever

Every page we send carries a control number and a status stamp, so you always know which version you are holding.

EVCompany
-
26Year
-
023Job
-
BIDDocument type
-
R04Revision

Status stamps

  • ISSUEDSent to you and current
  • SUPERSEDEDReplaced by a newer revision
  • EXECUTEDSigned, the contract copy
  • VOIDCancelled, kept on file

Documents you may receive

  • INSInspection report
  • CPTConcept
  • MPLMaster plan
  • BIDProposal
  • CO01Change order
  • INVInvoice
  • CLOCloseout package
  • WTYWarranty

Lines we do not cross

What we will not do

  • Price an inspection.The inspection report has no price in it. A proposal follows only if you ask for one.
  • Start a change without a signature.Work on a changed item waits until the change order is signed. Everything else keeps going.
  • Write a warranty we did not scope.The warranty in your proposal is the one you get, word for word, in the closeout.
  • Make you do the arithmetic.One number for the whole job, and the running total on every change order.

Plain words

Two terms you will see in your paperwork

Dry in
The point where the structure is closed to the weather: roof deck, underlayment and wrap on, openings covered, so rain stays out while the finish work goes on.
Substantial completion
The point where the work is finished enough to use for its purpose, with only punch list items left. Warranty cover starts here.

About a minute

Get a free quote

Tell us what you need and where. Add a few photos if you have them. We call you back during business hours with a time to come out, and you get the scope in writing before anyone lifts a tool.

  • No prices online. Every job is walked and bid in writing.
  • One number. One price for the whole job, with what is included and what is not.
  • Hablamos español. From the first call to the final walkthrough.

Tell us about the job

What do you need?
Where is the property?
Type of property
Tell us or show us
How do we reach you?
We call you in

Our team speaks English and Spanish.

We call you back during business hours, Mon to Fri 9 to 5 Central Time. Sending this asks us to call you about this request only. Privacy policy.

Rather talk? Call (979) 406-5431. Hablamos español.

Free quote

You click. We build. Deal?

Roofs, patios, concrete, remodels and whole builds. Tell us what you need and we will handle the rest. Hablamos español.